Great Ormond Street

Wordpress Theme

Great Ormond Street Hospital – Morgan Stanley Clinical Building

Great Ormond Street Hospital asked us to provide a storage proposal for the provision of staff lockers and bench seating to be used throughout the new clinical building. The locker layout was designed with a numbering and colour coded system to differentiate between separate staff changing areas.

A full quotation and proposed installation timetable agreed with the Trust was issued and accepted.

Order
*Over 600 locker storage compartments to accommodate all staff
*Range of coloured door lockers for each area
*4 Door mild steel staff lockers with numbered card holder and key fobs
*2 Door mild steel staff lockers with numbered card holder and key fobs
*On site survey & CAD design layouts
*Full Installation
*Timed delivery
*Full project management with an assigned site contact available 24 hours Out of hours Installation

Installation

The logistics of the installation were paramount to the smooth running of the whole hospital project.
Access to loading bays was limited to certain times and vehicle size restrictions – timed deliveries were provided.